Wow! It's been a long time since I've updated. Brian and I got engaged recently, so between school and wedding stuff I've hardly had time to do any yarn work.
I finished the set of dishcloths/washcloths and the bathmat for John and Jennie. To give it to them, we rolled up the items and put them in a basket. Around each item, like a napkin ring almost, we printed out labels. The labels said things like: 1388 wishes for a happy marriage. The number indicated the number of stitches involved in that item. The card said something like: each stitch contains our love and a wish for your future.
Sadly, I forgot to get a picture of the basket (or the items) before we gave it to them.
This weekend I felt a bit under the weather, so I spent most of it on the couch knitting (even though I didn't have the time to do that).
I have made much progress on the knitted scarf for Heather. It will definitely be done in time for her birthday. Though I may wait for Christmas anyway since she won't have any need for a scarf in Southern California in July.
The scarf ended up being 2x2 ribbing with 32 stitches per row. This way, every row is the same. It was too hard to determine which row I should do. The boucle yarn makes it so hard to see the stitches.
I started my first knitted hat. It involves two colors; I've never knitted with two colors before. And it involves short rows; something else I've never done. It's coming along very well.
Since it's an educational piece, I pulled out the worst yarn from my stash: RedHeart. It squeaks as I use it. Ick! The colors are nice though. A cherry red and a heathered gray. I didn't have the right sized needles (9), so I'm making it on 8s. If it doesn't fit, I won't care. I probably should have used 10s, but Heather's scarf is using my size 10 needles.
Sip or Stitch is meeting tonight. The week before last, we had seven people. Last week we only had 4.
Showing posts with label school. Show all posts
Showing posts with label school. Show all posts
Tuesday, April 22, 2008
Saturday, March 15, 2008
Update: not enough time to craft!
I have no time! :(
School is kicking my butt and I haven't had enough time to work on anything interesting.
I've been working on a bathmat. But I ran out of yarn last night. Hopefully I'll be able to find some of the same dye lot to finish it. I think I just need to make 2 more squares and sew it all together.
I found out my friend Nate and his wife are going to have a baby in October. So, I want to make them a baby-blanket for the stroller. I started it about half a dozen times and pulled it all out. The first time I had started with the wrong color yarn. Then I discovered that a size G hook didn't get me anywhere near gauge. I swatched about 4 times trying to get gauge. Finally, I started it again last night with a size-J hook and I am close to gauge. I'm a little off, but since it's a blanket, I'm not going to fret about it.
I've given up on the purple scarf for now. Every time I start it, the first few inches look great, then I get an extra stitch and can't get it back on the needles and looking right. Gonna wait until my stress level is lower. Maybe I'll work on it when Brian and I go to wine country (after finals in May).
School is kicking my butt and I haven't had enough time to work on anything interesting.
I've been working on a bathmat. But I ran out of yarn last night. Hopefully I'll be able to find some of the same dye lot to finish it. I think I just need to make 2 more squares and sew it all together.
I found out my friend Nate and his wife are going to have a baby in October. So, I want to make them a baby-blanket for the stroller. I started it about half a dozen times and pulled it all out. The first time I had started with the wrong color yarn. Then I discovered that a size G hook didn't get me anywhere near gauge. I swatched about 4 times trying to get gauge. Finally, I started it again last night with a size-J hook and I am close to gauge. I'm a little off, but since it's a blanket, I'm not going to fret about it.
I've given up on the purple scarf for now. Every time I start it, the first few inches look great, then I get an extra stitch and can't get it back on the needles and looking right. Gonna wait until my stress level is lower. Maybe I'll work on it when Brian and I go to wine country (after finals in May).
Subscribe to:
Posts (Atom)